• About Us
  • Submit Project
  • Advertise
  • NewsLetter
PA
Subscribe
  • Articles
    • Archipreneurs
    • Technology
    • Bim / Aec
    • 3D Printing
    • Architects
    • Artificial Intelligence
    • Robotics
    • Sustainability
    • Tools
    • Case Study
    • City Guide
    • Opinions
    • Interviews
    • Architecture & Design
      • Urbanism
      • Metaverse
      • Space Architecture
      • Geography
  • Projects
    • Architecture
    • Interior
    • Design
      • Fashion
      • Pavilion
      • Installation
      • Digital Art
      • Landscape Design
    • Products
  • News
  • Workshops
  • PA Talks
  • Videos
  • Books
  • More
    • PA+ Membership
    • Courses
    • Competitions
    • Events
    • Jobs
    • About Us
    • Contact Us
Font ResizerAa
PAPA
Search
  • Articles
    • Archipreneurs
    • Technology
    • Bim / Aec
    • 3D Printing
    • Architects
    • Artificial Intelligence
    • Robotics
    • Sustainability
    • Tools
    • Case Study
    • City Guide
    • Opinions
    • Interviews
    • Architecture & Design
  • Projects
    • Architecture
    • Interior
    • Design
    • Products
  • News
  • Workshops
  • PA Talks
  • Videos
  • Books
  • More
    • PA+ Membership
    • Courses
    • Competitions
    • Events
    • Jobs
    • About Us
    • Contact Us
Follow US
PA > Blog > Architecture News > Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Architecture News

Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027

Last updated: June 13, 2026 7:25 am
Isha Chaudhary
Isha Chaudhary
ByIsha Chaudhary
Isha Chaudhary is an architecture writer who follows and writes about current trends and emerging discussions in architecture, with a focus on design, technology, and place-making.
Share
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
List of Images 1/13
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
SHARE

The Fondation Beyeler in Riehen, Switzerland, is preparing to enter a new phase as its long-awaited expansion by renowned Swiss architect Peter Zumthor moves toward completion. Beginning in autumn 2026, visitors will gain access to portions of the expanded campus, while the full ensemble is scheduled to open in January 2027. The project significantly enlarges one of Europe’s most celebrated art institutions, extending its relationship with architecture, landscape, and contemporary culture.

Peter Zumthor’s New Museum Campus

Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027

Established in 1997 within a museum building designed by Renzo Piano, the Fondation Beyeler has become one of Switzerland’s most visited art museums. Situated within the historic Berower Park near Basel, the institution houses an internationally recognized collection of modern and contemporary art. The expansion continues the museum’s longstanding dialogue between art and architecture while responding to growing exhibition and visitor demands.

Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027

The origins of the project date back to 2016, when Peter Zumthor was selected through an international competition to design an extension for the museum. Zumthor envisioned a carefully composed ensemble of buildings integrated into the surrounding landscape. His proposal was inspired by the village-like character of Riehen and sought to preserve the site’s natural qualities while expanding the institution’s cultural reach.

Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027
Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027

The expanded campus connects the existing Renzo Piano museum with a series of new additions, including the House for Art, an event pavilion, and supporting service facilities. These new structures are arranged within the formerly private Iselin-Weber Park, transforming the historic grounds into a larger public cultural landscape. Together, the buildings create a seamless transition between exhibition spaces, gardens, and open-air experiences.

Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027

A defining aspect of the project is its emphasis on landscape. The expansion extends the museum grounds into a publicly accessible park where art, architecture, and nature coexist. New pathways, gardens, and gathering spaces are designed to encourage visitors to engage with the site beyond the gallery walls, reinforcing Fondation Beyeler’s commitment to creating immersive cultural experiences.

Peter Zumthor’s Expanded Fondation Beyeler Campus to Fully Open in 2027

The House for Art serves as the centerpiece of the development, providing additional exhibition capacity for the institution’s growing program of temporary exhibitions and collection displays. Designed with Zumthor’s characteristic attention to materiality, atmosphere, and spatial experience, the building is intended to complement it. This dialogue between two generations of acclaimed architects is expected to become one of the expansion’s most compelling architectural features.

The gradual opening strategy will allow visitors to experience the expanded grounds before the full completion of the campus. As new areas become accessible throughout autumn 2026, the institution will progressively introduce the public to its enlarged cultural landscape, culminating in the official opening of the complete ensemble in January 2027. The development represents a reimagining of the Fondation Beyeler as a cultural campus. By combining world-class art collections with architecture and public green space, Peter Zumthor’s design extends the museum’s legacy while creating new opportunities for engagement.

Image credit: © Atelier Peter Zumthor / Source: afasia Magazine

TAGGED:expansionFondation BeyelerPeter ZumthorRiehenSwitzerland
Share This Article
Email Copy Link Print
ByIsha Chaudhary
Isha Chaudhary is an architecture writer who follows and writes about current trends and emerging discussions in architecture, with a focus on design, technology, and place-making.
Previous Article 2026 FIFA World Cup Stadiums 2026 FIFA World Cup Stadiums: Complete List of All 16 Venues in USA, Canada, and Mexico
Next Article Hyphen Designs Rio AI City, a New Vision for Sustainable Data Infrastructure Hyphen Designs Rio AI City, a New Vision for Sustainable Data Infrastructure

More Stories

Construction Projects

Beyond the Architect: Rethinking Power and Hierarchy in Contemporary Construction Projects

By
Mahshid Motamed
How AI Is Transforming Outdoor Living Spaces Beyond The House

How AI Is Transforming Outdoor Living Spaces Beyond The House

By
PA Editorial Team
2026 FIFA World Cup Stadiums

5 Infrastructure Lessons from FIFA World Cup 2026: What Future Host Cities Must Learn

By
Pooja Khanna Tyagi
Miami Bay Towers

Miami Bay Towers Brings Four Sculptural Forms to Biscayne Bay

By
Isha Chaudhary
Origami architecture

Top 10 Buildings Shaped by the Art of Origami Folding in Architecture

By
Arpitha S
Sarnath

Sarnath Becomes India’s 45th UNESCO World Heritage Site

By
Isha Chaudhary
Korean Football Park

UNStudio Completes Korean Football Park in Cheonan

By
Isha Chaudhary
Iranian Architecture

A Legacy Built in Brick and Geometry: Arches in Iranian Architecture

By
Mahshid Motamed
Tianmeng Tower

Woods Bagot Shapes the IGG Tianmeng Tower Around Fuzhou’s Iconic Banyan Tree

By
Isha Chaudhary

Motion in the Shell by Melike Altinisik Architects

By
Hamid Hassanzadeh
Previous Next

Subscribe Newsletter

- Upcoming Workshop-
Ad image

You Might Also Like

First Museum of Digital Art
Architecture News

Dubai Unveils Region’s First Museum of Digital Art at DIFC

May 22, 2026
Architecture News

Apple released its new instruction-based AI image editing tool

February 10, 2024
Architecture News

University of Technology Sydney and BVN Architecture collaborated on designing 3D-printed air diffusion system

June 28, 2024
Architecture News

TUMO revealed first images of MVRDV’s design for EU TUMO Convergence Center in Armenia

March 29, 2023
PA

© All rights reserved. Parametric Architecture (2018-2026) - ISSN 3023-7564

Facebook Twitter Youtube Rss Medium

Get to Know Us

  • Architecture
  • Design
  • Digital Art
  • Fashion
  • Installation
  • Pavilion
  • Interior
  • Products

© 2026 ParametricArchitecture. All Rights Reserved. By utilizing this website, you are consenting to our User Agreement, Privacy Policy, and Cookie Statement. In compliance with the privacy laws of Turkey and the United States, we recognize and respect your rights. Please be aware that we may receive commissions for products bought through our affiliate links. Unauthorized reproduction, distribution, or transmission of any material from this site is strictly forbidden without prior written permission from ParametricArchitecture.

Join Us!
Subscribe to our newsletter and never miss our latest news, podcasts etc..
Please check admin setting to display form corretly.
Zero spam, Unsubscribe at any capitalpost.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?