• About Us
  • Submit Project
  • Advertise
  • NewsLetter
PA
Subscribe
  • Articles
    • Archipreneurs
    • Technology
    • Bim / Aec
    • 3D Printing
    • Architects
    • Artificial Intelligence
    • Robotics
    • Sustainability
    • Tools
    • Case Study
    • City Guide
    • Opinions
    • Interviews
    • Architecture & Design
      • Urbanism
      • Metaverse
      • Space Architecture
      • Geography
  • Projects
    • Architecture
    • Interior
    • Design
      • Fashion
      • Pavilion
      • Installation
      • Digital Art
      • Landscape Design
    • Products
  • News
  • Workshops
  • PA Talks
  • Videos
  • Books
  • More
    • PA+ Membership
    • Courses
    • Competitions
    • Events
    • Jobs
    • About Us
    • Contact Us
Font ResizerAa
PAPA
Search
  • Articles
    • Archipreneurs
    • Technology
    • Bim / Aec
    • 3D Printing
    • Architects
    • Artificial Intelligence
    • Robotics
    • Sustainability
    • Tools
    • Case Study
    • City Guide
    • Opinions
    • Interviews
    • Architecture & Design
  • Projects
    • Architecture
    • Interior
    • Design
    • Products
  • News
  • Workshops
  • PA Talks
  • Videos
  • Books
  • More
    • PA+ Membership
    • Courses
    • Competitions
    • Events
    • Jobs
    • About Us
    • Contact Us
Follow US
PA > Blog > Projects > Architecture > MVRDV Begins Construction on EU TUMO Convergence Center in Armenia
Architecture

MVRDV Begins Construction on EU TUMO Convergence Center in Armenia

Last updated: February 25, 2026 2:48 pm
Isha Chaudhary
Isha Chaudhary
ByIsha Chaudhary
Isha Chaudhary is an architecture writer who follows and writes about current trends and emerging discussions in architecture, with a focus on design, technology, and place-making.
Share
EU TUMO Convergence Center
EU TUMO Convergence Center ©︎ MVRDV
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
List of Images 1/9
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
EU TUMO Convergence Center
SHARE

On 24 February, in the presence of Armenian Prime Minister Nikol Pashinyan, Dutch architecture firm MVRDV marked the start of construction for the EU TUMO Convergence Center. The new building rises on TUMO’s campus in Tumanyan Park, positioned above the Hrazdan River Gorge with open views across the city and toward Mount Ararat.

Contents
  • Architecture That Responds to Landscape and Purpose
  • Designed for Flexibility, Built for the Future
  • Strengthening Yerevan’s Tech Ecosystem
  • EU TUMO Convergence Center

The project is MVRDV’s first in Armenia and a new chapter for the growing TUMO network. Since its founding in 2011, the TUMO Center for Creative Technologies has provided free education in technology and design to more than 100,000 young people. What began in Yerevan has expanded to 25 centers across Armenia and abroad, including Paris, Berlin, Mumbai, and Tirana, where TUMO occupies the Pyramid of Tirana redesigned by MVRDV.

EU TUMO Convergence Center

The EU TUMO Convergence Center will expand the organization’s main campus, bringing together education, research, and industry under one roof. In addition to classrooms and training spaces, the building will host technology and design companies, conference facilities, and start-up support programs. The aim is to strengthen ties between students, universities, and the private sector, helping young people move more easily into professional life.

Architecture That Responds to Landscape and Purpose

EU TUMO Convergence Center

The building’s form responds directly to its steep, elevated site. A 120-meter-long horizontal volume rests on a sunken base, projecting outward at both ends over the slopes. Large windows frame views north toward the river gorge and south toward Mount Ararat, a powerful symbol in Armenian history and culture.

The base podium lifts the structure to a prominent height and extends the landscape of Tumanyan Park onto the site, creating a sloped terrain that incorporates architecture and parkland.

EU TUMO Convergence Center

“With TUMO’s hall on the hill, we created an innovation platform that brings together education and industry, the main forces driving progress,” said Winy Maas, founding partner of MVRDV. “The new facility represents the heart of Yerevan’s emerging tech campus but is positioned on the axis of history, an ‘Ark’ hovering over the gorge. Its cantilevered form mirrors the idea of standing on a precipice of change, reaching out toward the future. I think that’s a nice symbolism.”

Designed for Flexibility, Built for the Future

EU TUMO Convergence Center

Inside, the building spans five storeys, organized around three large atriums that connect directly to the ground floor. These internal spaces structure the life of the building.

At the center is the “Grotto,” which serves as the main entrance along the building’s primary axis. It houses a café and digital lounge, designed as an informal meeting point for students, entrepreneurs, and visitors.

At the southern end, the “Valley” rises the full height of the structure and contains a flexible event hall. This space can host conferences, lectures, and public gatherings, reinforcing the center’s civic role.

EU TUMO Convergence Center

On the northern side, the “Canyon” creates vertical connections between floors and supports co-working spaces of varying sizes. Together, these atriums draw daylight deep into the building. A translucent polycarbonate façade filters sunlight during the day and gives the volume a soft glow at night, turning the structure into a visible presence above the gorge.

MVRDV’s design extends the rocky terrain of Tumanyan Park into the site, forming outdoor areas for informal study, rest, and events. Pathways weave between seating areas and landscaped zones, encouraging movement and interaction.

An access bridge from the west leads visitors into the central Grotto and continues outward as a viewing platform over the river, reinforcing the building’s relationship with its dramatic surroundings.

Floor plates are arranged around two cores, allowing layouts to shift over time as TUMO’s programs evolve or as other organizations move in. This adaptability is intended to prolong the building’s lifespan and reduce the need for major renovations in the future.

EU TUMO Convergence Center

Sustainability measures address both construction and operation. A bubble-deck slab system reduces the amount of concrete required, lowering the building’s overall weight and embodied carbon. The atriums act as thermal buffers, with separate climate systems and wider temperature ranges throughout the year. Anti-stratification fans and low-temperature floor heating help maintain comfort while limiting energy use.

Strengthening Yerevan’s Tech Ecosystem

TUMO’s existing program provides free education in technology and ecology to 12- to 18-year-olds, helping them build skills for an increasingly global job market. The EU TUMO Convergence Center broadens that mission by supporting adult learners and fostering direct links between higher education and industry.

The ceremony was attended by Marie Lou Papazian, founding CEO of the TUMO Center for Creative Technologies; Prime Minister Nikol Pashinyan; Zhanna Andreasyan, Minister of Education, Science, Culture, and Sport; Tigran Avinyan, Mayor of Yerevan; and Vassilis Maragos, EU Ambassador to Armenia.

EU TUMO Convergence Center

Set high above the Hrazdan River Gorge, the EU TUMO Convergence Center positions itself both physically and symbolically at the meeting point of history and innovation. As construction begins, it marks a clear step in Yerevan’s ambition to strengthen its role as a regional hub for technology, design, and education.

EU TUMO Convergence Center

Project Name: EU TUMO Convergence Center
Location: Tumanyan Park, Yerevan, Armenia
Architect: MVRDV
Client: TUMO Center for Creative Technologies
Status: Under construction (construction started 24 February)
Program: Education, research, co-working, conference, and event facilities
Campus: TUMO Main Campus, Yerevan

Image credit: © MVRDV

TAGGED:ArmeniaEU TUMO Convergence Centerfree educationmvrdvtechnology and designYerevan
Share This Article
Email Copy Link Print
ByIsha Chaudhary
Isha Chaudhary is an architecture writer who follows and writes about current trends and emerging discussions in architecture, with a focus on design, technology, and place-making.
Previous Article Pritzker Architecture Prize delay 2026 Pritzker Architecture Prize Announcement Delayed Amid Controversy
Next Article Foster + Partners Designs 55-Story 2 World Trade Center for American Express Foster + Partners Designs 55-Story 2 World Trade Center for American Express

More Stories

Construction Projects

Beyond the Architect: Rethinking Power and Hierarchy in Contemporary Construction Projects

By
Mahshid Motamed
How AI Is Transforming Outdoor Living Spaces Beyond The House

How AI Is Transforming Outdoor Living Spaces Beyond The House

By
PA Editorial Team
2026 FIFA World Cup Stadiums

5 Infrastructure Lessons from FIFA World Cup 2026: What Future Host Cities Must Learn

By
Pooja Khanna Tyagi
Miami Bay Towers

Miami Bay Towers Brings Four Sculptural Forms to Biscayne Bay

By
Isha Chaudhary
Origami architecture

Top 10 Buildings Shaped by the Art of Origami Folding in Architecture

By
Arpitha S
Sarnath

Sarnath Becomes India’s 45th UNESCO World Heritage Site

By
Isha Chaudhary
Korean Football Park

UNStudio Completes Korean Football Park in Cheonan

By
Isha Chaudhary
Iranian Architecture

A Legacy Built in Brick and Geometry: Arches in Iranian Architecture

By
Mahshid Motamed
Tianmeng Tower

Woods Bagot Shapes the IGG Tianmeng Tower Around Fuzhou’s Iconic Banyan Tree

By
Isha Chaudhary

Motion in the Shell by Melike Altinisik Architects

By
Hamid Hassanzadeh
Previous Next

Subscribe Newsletter

- Upcoming Workshop-
Ad image

You Might Also Like

Carlo Ratti Associati, Buzzi Heritage Cultural Center
Architecture NewsArchitecture

Concrete Takes Center Stage at Buzzi Heritage in Italy

April 4, 2026
ProjectsArchitecture

fjmt’s design vision for Bunjil Place aims to achieve authenticity

July 12, 2023
ProjectsArchitecture

Open Architecture designed Shanghai school like a transparent box

December 7, 2022
ArchitectureProjects

The IOC Headquarters, A Sustainable Building by 3XN Architects

August 5, 2024
PA

© All rights reserved. Parametric Architecture (2018-2026) - ISSN 3023-7564

Facebook Twitter Youtube Rss Medium

Get to Know Us

  • Architecture
  • Design
  • Digital Art
  • Fashion
  • Installation
  • Pavilion
  • Interior
  • Products

© 2026 ParametricArchitecture. All Rights Reserved. By utilizing this website, you are consenting to our User Agreement, Privacy Policy, and Cookie Statement. In compliance with the privacy laws of Turkey and the United States, we recognize and respect your rights. Please be aware that we may receive commissions for products bought through our affiliate links. Unauthorized reproduction, distribution, or transmission of any material from this site is strictly forbidden without prior written permission from ParametricArchitecture.

Join Us!
Subscribe to our newsletter and never miss our latest news, podcasts etc..
Please check admin setting to display form corretly.
Zero spam, Unsubscribe at any capitalpost.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?